*Required
×

How It Works

Our methodology focuses on efficiency, reliability, and sustainability.

We streamline the process of creating your ADU in half the time and half the expense of the typical ADU by using Helical Piles, Pre-finished Structural Insulated Panels (SIPs), and having our own in-house Permits Technician and Pre-Engineered design sets.

Our

Process

visit or call

01

Visit/Call

Our Team would conduct a full showroom tour focusing on ADU design, build materials, and construction processes. Get to see our SIPs, Helical Piles. Inclusion options and a lot more.

Click here to get started.

adu cost-estimate

02

ADU Cost-Estimate

Based on your desired specs, we'll give you a free and quick cost estimate using our "Cost Estimator". We'll also check your property's qualification for our ADUs using our QCT powered by Canibuild."

site visit

03

Site Visit

Our team will physically check your property and conduct comprehensive permit research based on your jurisdiction. We'll examine your utility tie-in points and check for any additional site-specific work that may be required.

build agreement

04

Build Agreement

The Build Agreement will contain all contract specifications for your chosen configuration including inclusions, site-specific work, permits required, build materials, and the payment terms & timeline.

Streamlined Build

Process & Timeline

chart-flag
Pre-Submittal  
Permits Preparation  
chart-flag
Permitting Process  
SIP Manufacturing & Materials Pocurement  
chart-flag
On-Site Construction  
START
MONTH 1
MONTH 2
MONTH 3
MONTH 4
MONTH 5

Process 1

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.
audit

Process 2

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.
checked

Process 3

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.
house

Process 4

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.
house

Process 5

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.
inspection
audit

Pre-Submittal & Permits

checked

Permitting Process & Approvals

house

Off-SiteWork

house

On-SiteConstruction

inspection

ADU Inspection

Start
Month 1
Month 2
Month 3
Month 4
Month 5
Pre-Submittal
Permits Prep.
Permitting Process
SIP Manufacturing & Materials Procurement
Pre-Finishing
On-Site Work
ADU Inspection
LOW COST, NO COMPROMISE ADUs

Three

Innovative

Factors

sips

Structurally Insulated Panels

SIPs are made up of insulating foam cores sandwiched tightly between two structural facings that are designed and precisely manufactured off-site. Once these are completed, it only takes 30-60 days of onsite work and one contractor to complete your ADU.

helical pile main

Helical Piles Foundation

A helical pile is a steel shaft with helices that is screwed into the ground to help anchor the ADU to the soil. This process requires only small machinery and a team of 2-3 people to complete in about 3 days.

plan sets

Pre-engineered Plan Sets

Pre-engineered plan sets are ready-to-build diagrams which allows for quick, reliable & simple construction process – streamlining the need for inventorying materials or planning.