Your ADU Journey with ADU.Works

A Step-by-Step Guide to Building Your ADU Project

Book a free consultation

Your ADU Journey with ADU.Works

A Step-by-Step Guide to Building Your Dream ADU

Our methodology focuses on efficiency, reliability, and sustainability.

We streamline the process of creating your ADU in half the time and half the expense of the typical ADU by using Helical Piles, Pre-finished Structural Insulated Panels (SIPs), and having our own in-house Permits Technician and Pre-Engineered design sets.

Our Streamlined Build Process

At ADU.Works, we provide a simple and straightforward process to help you build your dream ADU. 

visit or call

01

Initial Consultation

During the Discovery Call, we will get to know you and your ADU needs. Our ADU Specialist will provide you with an overview of our models and processes and schedule a showroom visit to discuss the next steps.

site visit

02

Site Assessment

Our team will conduct a site assessment to determine the feasibility and placement options for your ADU, including evaluating site-specific costs. We will also research your property's jurisdiction and permit requirements and include this information in the feasibility report. This report will also provide an estimate of the total cost of the ADU on your property.

adu cost-estimate

03

Feasibility Report & Estimated Cost

After the site assessment, we'll create a feasibility report to guide the following of the build process. The report will provide an estimated additional cost based on our base cost of the unit and include a layout of the proposed ADU, along with an estimate of any site-specific work needed to complete the project. Additionally, the report will be used to prepare the engineering of your ADU.

build agreement

04

Build Agreement

Once you've decided to move forward, we will provide you with a Build Agreement that outlines the entire process from pre-development and engineering to the delivery of your ADU. This will include specific site-specific costs, the estimated timeline to complete the project, fee schedules, permit requirements, and the estimated cost of your ADU.

chart-flag
Pre-Submittal  
Permits Preparation  
chart-flag
Permitting Process  
SIP Manufacturing & Materials Pocurement  
chart-flag
On-Site Construction  
START
STEP 1
STEP 2
STEP 3
STEP 4
STEP 5

Get a Free Consultation

Let’s have a chat and know how we could assist you in building your ADU.

GET STARTED
×

Process 1

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.
audit

Process 2

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.
checked

Process 3

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.
house

Process 4

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.
house

Process 5

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.
inspection
audit

Pre-Submittal & Permits

checked

Permitting Process & Approvals

house

Off-SiteWork

house

On-SiteConstruction

inspection

ADU Inspection

Start
Month 1
Month 2
Month 3
Month 4
Month 5
Pre-Submittal
Permits Prep.
Permitting Process
SIP Manufacturing & Materials Procurement
Pre-Finishing
On-Site Work
ADU Inspection
LOW COST, NO COMPROMISE ADUs

Three

Innovative

Factors

sips

Structurally Insulated Panels

SIPs are made up of insulating foam cores sandwiched tightly between two structural facings that are designed and precisely manufactured off-site. Once these are completed, it only takes 30-60 days of onsite work and one contractor to complete your ADU.

helical pile main

Helical Piles Foundation

A helical pile is a steel shaft with helices that is screwed into the ground to help anchor the ADU to the soil. This process requires only small machinery and a team of 2-3 people to complete in about 3 days.

plan sets

Pre-engineered Plan Sets

Pre-engineered plan sets are ready-to-build diagrams which allows for quick, reliable & simple construction process – streamlining the need for inventorying materials or planning.